CWICR进度整合器
tools-only2026-10-27查看 1643复制 418
将 CWICR 成本数据与项目进度计划集成。将工作项链接到进度活动,生成成本加载的进度计划和现金流预测。
📘如何使用这个技能
- 1复制技能内容·点击上方「Copy SKILL.md」复制全部内容,或 Download 下载到本地
- 2打开你的 AI 客户端·支持 Claude Code、Trae、Cursor、ChatGPT、DeepSeek、Kimi 等任意 AI 助手
- 3粘贴为系统提示/知识文件·Claude Code:放入 .claude/skills/ 目录;普通对话:作为首条消息发送并说「请严格按这份技能文档执行」
- 4直接提出你的需求·AI 会按技能定义的工作流、格式和约束来处理,无需再解释背景
💡 提示:技能生效后,每次对话只需一句需求,AI 会按 SKILL.md 的流程执行。
SKILL.md15465 chars
---
name: "cwicr-schedule-integrator"
description: "Integrate CWICR cost data with project schedules. Link work items to schedule activities, generate cost-loaded schedules, and cash flow projections."
homepage: "https://datadrivenconstruction.io"
metadata: {"openclaw": {"emoji": "🗄️", "os": ["darwin", "linux", "win32"], "homepage": "https://datadrivenconstruction.io", "requires": {"bins": ["python3"]}}}
---
# CWICR Schedule Integrator
## Business Case
### Problem Statement
Project planning requires:
- Linking costs to schedule activities
- Generating cost-loaded schedules
- Projecting cash flow requirements
- Tracking earned value
### Solution
Integrate CWICR cost data with project schedules to create cost-loaded Gantt charts, cash flow curves, and earned value tracking.
### Business Value
- **Cost visibility** - See when costs occur
- **Cash flow** - Project funding requirements
- **Earned value** - Track cost/schedule performance
- **Integration** - Connect cost and schedule data
## Technical Implementation
```python
import pandas as pd
import numpy as np
from typing import Dict, Any, List, Optional, Tuple
from dataclasses import dataclass, field
from datetime import datetime, timedelta, date
from enum import Enum
from collections import defaultdict
class CostDistribution(Enum):
"""Methods for distributing costs over time."""
UNIFORM = "uniform" # Even distribution
FRONT_LOADED = "front_loaded" # More at start
BACK_LOADED = "back_loaded" # More at end
S_CURVE = "s_curve" # S-curve distribution
@dataclass
class ScheduleActivity:
"""Project schedule activity."""
activity_id: str
description: str
start_date: date
end_date: date
duration_days: int
work_items: List[str]
budgeted_cost: float
predecessors: List[str] = field(default_factory=list)
@dataclass
class CostLoadedActivity:
"""Activity with daily cost distribution."""
activity: ScheduleActivity
daily_costs: Dict[date, float]
cumulative_costs: Dict[date, float]
@dataclass
class CashFlowProjection:
"""Cash flow projection."""
project_name: str
start_date: date
end_date: date
total_cost: float
daily_costs: Dict[date, float]
weekly_costs: Dict[str, float]
monthly_costs: Dict[str, float]
cumulative: Dict[date, float]
@dataclass
class EarnedValueMetrics:
"""Earned value metrics at point in time."""
data_date: date
planned_value: float # PV / BCWS
earned_value: float # EV / BCWP
actual_cost: float # AC / ACWP
schedule_variance: float # SV = EV - PV
cost_variance: float # CV = EV - AC
spi: float # Schedule Performance Index
cpi: float # Cost Performance Index
eac: float # Estimate at Completion
etc: float # Estimate to Complete
class CWICRScheduleIntegrator:
"""Integrate CWICR costs with project schedules."""
def __init__(self, cwicr_data: pd.DataFrame):
self.cost_data = cwicr_data
self._index_data()
def _index_data(self):
"""Index cost data."""
if 'work_item_code' in self.cost_data.columns:
self._code_index = self.cost_data.set_index('work_item_code')
else:
self._code_index = None
def get_work_item_cost(self, code: str, quantity: float) -> float:
"""Get total cost for work item."""
if self._code_index is None or code not in self._code_index.index:
return 0
item = self._code_index.loc[code]
labor = float(item.get('labor_cost', 0) or 0)
material = float(item.get('material_cost', 0) or 0)
equipment = float(item.get('equipment_cost', 0) or 0)
return (labor + material + equipment) * quantity
def create_schedule_activity(self,
activity_id: str,
description: str,
start_date: date,
duration_days: int,
work_items: List[Dict[str, Any]],
predecessors: List[str] = None) -> ScheduleActivity:
"""Create schedule activity with linked work items."""
# Calculate budgeted cost
total_cost = 0
codes = []
for item in work_items:
code = item.get('work_item_code', item.get('code'))
qty = item.get('quantity', 0)
total_cost += self.get_work_item_cost(code, qty)
codes.append(code)
end_date = start_date + timedelta(days=duration_days)
return ScheduleActivity(
activity_id=activity_id,
description=description,
start_date=start_date,
end_date=end_date,
duration_days=duration_days,
work_items=codes,
budgeted_cost=round(total_cost, 2),
predecessors=predecessors or []
)
def distribute_cost(self,
activity: ScheduleActivity,
method: CostDistribution = CostDistribution.UNIFORM) -> CostLoadedActivity:
"""Distribute activity cost over duration."""
daily_costs = {}
days = activity.duration_days
if days == 0:
daily_costs[activity.start_date] = activity.budgeted_cost
else:
if method == CostDistribution.UNIFORM:
daily_amount = activity.budgeted_cost / days
for i in range(days):
day = activity.start_date + timedelta(days=i)
daily_costs[day] = daily_amount
elif method == CostDistribution.FRONT_LOADED:
# Higher at start, decreasing
total_weight = sum(range(days, 0, -1))
for i in range(days):
day = activity.start_date + timedelta(days=i)
weight = (days - i) / total_weight
daily_costs[day] = activity.budgeted_cost * weight
elif method == CostDistribution.BACK_LOADED:
# Lower at start, increasing
total_weight = sum(range(1, days + 1))
for i in range(days):
day = activity.start_date + timedelta(days=i)
weight = (i + 1) / total_weight
daily_costs[day] = activity.budgeted_cost * weight
elif method == CostDistribution.S_CURVE:
# S-curve distribution (sigmoid)
for i in range(days):
day = activity.start_date + timedelta(days=i)
# Sigmoid function normalized
x = (i / days - 0.5) * 10
sigmoid = 1 / (1 + np.exp(-x))
daily_costs[day] = activity.budgeted_cost * sigmoid / days * 2
# Calculate cumulative
cumulative = {}
running_total = 0
for day in sorted(daily_costs.keys()):
running_total += daily_costs[day]
cumulative[day] = running_total
return CostLoadedActivity(
activity=activity,
daily_costs=daily_costs,
cumulative_costs=cumulative
)
def generate_cash_flow(self,
activities: List[ScheduleActivity],
project_name: str = "Project",
distribution: CostDistribution = CostDistribution.S_CURVE) -> CashFlowProjection:
"""Generate project cash flow projection."""
# Distribute costs for all activities
loaded_activities = [
self.distribute_cost(a, distribution)
for a in activities
]
# Aggregate daily costs
daily_costs = defaultdict(float)
for loaded in loaded_activities:
for day, cost in loaded.daily_costs.items():
daily_costs[day] += cost
# Sort and calculate cumulative
sorted_days = sorted(daily_costs.keys())
cumulative = {}
running_total = 0
for day in sorted_days:
running_total += daily_costs[day]
cumulative[day] = running_total
# Aggregate to weekly
weekly_costs = defaultdict(float)
for day, cost in daily_costs.items():
week_key = day.strftime('%Y-W%W')
weekly_costs[week_key] += cost
# Aggregate to monthly
monthly_costs = defaultdict(float)
for day, cost in daily_costs.items():
month_key = day.strftime('%Y-%m')
monthly_costs[month_key] += cost
return CashFlowProjection(
project_name=project_name,
start_date=min(daily_costs.keys()) if daily_costs else date.today(),
end_date=max(daily_costs.keys()) if daily_costs else date.today(),
total_cost=sum(daily_costs.values()),
daily_costs=dict(daily_costs),
weekly_costs=dict(weekly_costs),
monthly_costs=dict(monthly_costs),
cumulative=cumulative
)
def calculate_earned_value(self,
activities: List[ScheduleActivity],
progress: Dict[str, float], # activity_id -> percent complete
actual_costs: Dict[str, float], # activity_id -> actual cost
data_date: date) -> EarnedValueMetrics:
"""Calculate earned value metrics."""
# Generate planned value curve
cash_flow = self.generate_cash_flow(activities)
# Planned Value (BCWS) - budgeted cost through data date
pv = sum(
cost for day, cost in cash_flow.daily_costs.items()
if day <= data_date
)
# Earned Value (BCWP) - budgeted cost * percent complete
ev = sum(
a.budgeted_cost * progress.get(a.activity_id, 0) / 100
for a in activities
)
# Actual Cost (ACWP)
ac = sum(actual_costs.values())
# Variances
sv = ev - pv
cv = ev - ac
# Indices
spi = ev / pv if pv > 0 else 0
cpi = ev / ac if ac > 0 else 0
# Estimate at completion
bac = sum(a.budgeted_cost for a in activities)
if cpi > 0:
eac = bac / cpi
else:
eac = bac
etc = eac - ac
return EarnedValueMetrics(
data_date=data_date,
planned_value=round(pv, 2),
earned_value=round(ev, 2),
actual_cost=round(ac, 2),
schedule_variance=round(sv, 2),
cost_variance=round(cv, 2),
spi=round(spi, 2),
cpi=round(cpi, 2),
eac=round(eac, 2),
etc=round(etc, 2)
)
def export_cash_flow(self,
cash_flow: CashFlowProjection,
output_path: str) -> str:
"""Export cash flow to Excel."""
with pd.ExcelWriter(output_path, engine='openpyxl') as writer:
# Summary
summary_df = pd.DataFrame([{
'Project': cash_flow.project_name,
'Start Date': cash_flow.start_date,
'End Date': cash_flow.end_date,
'Total Cost': cash_flow.total_cost
}])
summary_df.to_excel(writer, sheet_name='Summary', index=False)
# Monthly
monthly_df = pd.DataFrame([
{'Month': month, 'Cost': cost}
for month, cost in sorted(cash_flow.monthly_costs.items())
])
monthly_df.to_excel(writer, sheet_name='Monthly', index=False)
# Weekly
weekly_df = pd.DataFrame([
{'Week': week, 'Cost': cost}
for week, cost in sorted(cash_flow.weekly_costs.items())
])
weekly_df.to_excel(writer, sheet_name='Weekly', index=False)
# Daily with cumulative
daily_df = pd.DataFrame([
{
'Date': day.strftime('%Y-%m-%d'),
'Daily Cost': round(cash_flow.daily_costs[day], 2),
'Cumulative': round(cash_flow.cumulative[day], 2)
}
for day in sorted(cash_flow.daily_costs.keys())
])
daily_df.to_excel(writer, sheet_name='Daily', index=False)
return output_path
def import_schedule_from_csv(self,
schedule_file: str,
work_items_file: str) -> List[ScheduleActivity]:
"""Import schedule and work items from CSV files."""
schedule_df = pd.read_csv(schedule_file)
work_items_df = pd.read_csv(work_items_file)
activities = []
for _, row in schedule_df.iterrows():
activity_id = row['activity_id']
# Get work items for this activity
activity_items = work_items_df[
work_items_df['activity_id'] == activity_id
].to_dict('records')
activity = self.create_schedule_activity(
activity_id=activity_id,
description=row['description'],
start_date=pd.to_datetime(row['start_date']).date(),
duration_days=int(row['duration_days']),
work_items=activity_items,
predecessors=row.get('predecessors', '').split(',') if pd.notna(row.get('predecessors')) else []
)
activities.append(activity)
return activities
```
## Quick Start
```python
from datetime import date
# Load CWICR data
cwicr = pd.read_parquet("ddc_cwicr_en.parquet")
# Initialize integrator
integrator = CWICRScheduleIntegrator(cwicr)
# Create activities
activity1 = integrator.create_schedule_activity(
activity_id="A001",
description="Foundation Excavation",
start_date=date(2024, 6, 1),
duration_days=10,
work_items=[
{'work_item_code': 'EXCV-001', 'quantity': 500}
]
)
activity2 = integrator.create_schedule_activity(
activity_id="A002",
description="Foundation Concrete",
start_date=date(2024, 6, 11),
duration_days=15,
work_items=[
{'work_item_code': 'CONC-001', 'quantity': 150},
{'work_item_code': 'REBAR-002', 'quantity': 5000}
],
predecessors=["A001"]
)
# Generate cash flow
activities = [activity1, activity2]
cash_flow = integrator.generate_cash_flow(activities, "Building Project")
print(f"Total Cost: ${cash_flow.total_cost:,.2f}")
print(f"Project Duration: {(cash_flow.end_date - cash_flow.start_date).days} days")
```
## Common Use Cases
### 1. Monthly Cash Flow
```python
for month, cost in cash_flow.monthly_costs.items():
print(f"{month}: ${cost:,.2f}")
```
### 2. Earned Value Analysis
```python
progress = {'A001': 100, 'A002': 60}
actual_costs = {'A001': 45000, 'A002': 72000}
evm = integrator.calculate_earned_value(
activities,
progress,
actual_costs,
data_date=date(2024, 6, 20)
)
print(f"CPI: {evm.cpi}")
print(f"SPI: {evm.spi}")
print(f"EAC: ${evm.eac:,.2f}")
```
### 3. Export Cash Flow
```python
integrator.export_cash_flow(cash_flow, "project_cash_flow.xlsx")
```
## Resources
- **GitHub**: [OpenConstructionEstimate-DDC-CWICR](https://github.com/datadrivenconstruction/OpenConstructionEstimate-DDC-CWICR)
- **DDC Book**: Chapter 3.2 - Cost-Schedule Integration